Gorgeous Scenery on this Model Railway Layout
November 1st, 2009 by Model Railway Layouts
Check out the mountains and hills and all the tunnels in this layout. This model railroader says that it can take 10 minutes for a train to make its way around the entire loop of his setup.
- Related model railway layout items:
- Adding Hills and Bridges to Your Model Railway Layout
- Amazing O-Scale Model Railway Layout
- Take a Ride on a G-Scale
- Model Railway Layout Backdrops
- Tunnels for your Model Railway Layout
- Tags: model railway scenery, mountains, tunnels
Posted in Miniature Railway, Model Railroad Scenery | No Comments »
